Commercial Window Treatments

Westfield Commercial Window Treatments

Specified to the submittal, installed around your hours

Call (317) 863-9966Get Free Quote
Quick Answer

If you've narrowed things down to this product, these answers should confirm the choice or steer you elsewhere. Either outcome is fine. Ordering the wrong thing in custom sizes is the expensive mistake.

  • Service: Commercial Window Treatments for Westfield homeowners
  • Service area: Westfield, IN and surrounding areas
  • Two different timelines apply. New custom product takes weeks because it has to be made. Repairs to what's already hanging, a cord lock, a ladder string, a chain that jumped the clutch, are usually far quicker.
  • Insured and bonded
  • Serving Westfield, IN since 2008
Commercial Window Treatments Services

Expert Commercial Window Treatments for Westfield Homes

Commercial work in Westfield exists because of what happened after 2014. Grand Park opened that year as a 400 acre campus with 26 baseball and softball diamonds and 31 multipurpose fields, added an indoor events center in July 2016, and now draws roughly 750,000 visitors and 1,900,000 visits a year, with the Indianapolis Colts holding training camp there under a ten year contract from 2018. The hospitality, medical and office space that followed sits along US 31 and State Road 32, at Grand Park Village and at Bridgewater Marketplace and its corporate village.

Commercial specification is a different discipline from residential and the differences are concrete. Control height and operating force are governed by the ADA Standards for Accessible Design: section 308 sets forward reach at 15 to 48 inches unobstructed and 44 inches maximum over an obstruction deeper than 20 inches, and section 309.4 requires controls operable with one hand, without tight grasping, pinching or twisting, at no more than 5 pounds of force. That decides control type before anybody discusses fabric.

Fabric selection carries its own requirement. NFPA 701, 2023 edition, is the flame propagation test that commercial drapery and fabric specifications cite, and Indiana enforces the 2014 Indiana Fire Code and Building Code, based on the 2012 IFC and IBC, where Chapter 8 covers draperies and decorative materials in regulated occupancies. Where the occupancy calls for it, the test documentation belongs in the submittal instead of being asserted at a meeting. And the budget conversation is different: commercial work is often funded from a capital or tenant improvement allowance rather than an operating budget, which changes the approval timeline rather than the work.

When to Call

Signs You Need Commercial Window Treatments

If you notice any of these in your Westfield home, it is worth booking a measure. None of it is urgent, and none of it fixes itself either.

A tenant fit out needs one specification across a floor

West glare makes a conference room unusable after lunch

Controls sit too high for accessible reach ranges

An occupancy needs flame propagation tested fabric

Patient or exam rooms need privacy plus daylight

A hospitality property needs blackout in guest rooms

Existing blinds across a building no longer match

Work has to happen around the building's own hours

Our Process

How Westfield Window Treatments Handles Commercial Window Treatments

Every job follows the same six-step process. Transparent, thorough, and done right the first time.

1

Read the spec and the occupancy

Before measuring, we establish what the occupancy requires. Whether NFPA 701 flame propagation tested fabric is needed, what the accessible control requirements are for the space, and whether an architect or designer has already issued a specification we're pricing against rather than writing. Getting that in order first prevents a submittal being rejected.

2

Survey every opening

Three widths, three heights and a diagonal on each, plus substrate: drywall, metal stud, masonry or an existing ceiling grid all take different fixings. Building openings vary more than a drawing suggests, particularly in a fit out of existing space, so nothing gets ordered off a floor plan without a physical survey.

3

Set control type and height

Control type gets selected against ADA section 309.4, one handed operation without tight grasping, pinching or twisting and no more than 5 pounds of force, and mounted within the section 308 reach ranges. On a large glass line that frequently points to motorized control at a keypad rather than a manual chain at height.

4

Build the submittal

Product data, fabric samples, flame propagation test documentation where required, control details, mounting details and a written schedule keyed to the openings. This is where a commercial job is won or lost, and it's the part a residential process doesn't have. Lead times get confirmed in writing before anybody plans a phased occupancy around them.

5

Phase around operations

Installation gets planned around the building's hours rather than ours. A hotel installs by floor, a medical suite by exam room between clinics, an office over evenings or a weekend. That gets agreed at the schedule stage and written down, because a phased install discovered on day one is a problem for the tenant, not for us.

6

Document and hand over

As installed schedule, product and fabric identification for future matching, control programming details, and cleaning and service guidance for the facilities team. The value of that paperwork shows in three years when a floor gets refreshed and somebody needs to match what's already there rather than re specifying the whole building.

Real Project Photos

Commercial Window Treatments in Westfield

Photographs from real commercial window treatments jobs completed by our crew in Westfield and surrounding areas.

Custom shades measured and installed in Westfield
Scope of Work

What Commercial Window Treatments Includes

Every Westfield job is documented item by item. Here is what the crew covers.

Site walk with the facilities contact to log every opening, elevation and existing condition

Openings measured individually rather than typed off a floor plan, because as-built rarely matches drawn

Occupancy and fire requirements confirmed with the authority having jurisdiction before fabric selection

NFPA 701 flame propagation test documentation obtained and included in the submittal package

Fabric, hardware and finish samples submitted for approval before anything is released to fabrication

Control type and mounting height set against ADA section 308 reach ranges where the space requires it

Operating force checked against the ADA section 309.4 limit of five pounds on operable parts

Motorization specified wherever a manual control can't meet reach or force requirements

Openness factor selected per elevation so screens and monitors stay usable through the day

Dual roller assemblies drawn where one opening needs both glare control and darkness

Coupled tubes specified on wide spans so a run of openings reads as one continuous line

Written lead times issued with the order and updated in writing whenever the factory moves a date

Install phased around operating hours, floor by floor or wing by wing, with access arranged in advance

Elevator, loading and badge access coordinated so crews aren't working out of a corridor

Debris and packaging removed daily rather than staged in occupied space

Attic stock quantities agreed up front so a damaged unit can be swapped without a new order

Punch list walked with the owner's representative and closed out in writing

Operation, cleaning and parts information handed to facilities in a document they can actually find later

Pricing

What Commercial Window Treatments Cost in Westfield

Commercial pricing works per opening the same way residential does. The national ranges to anchor against are roughly $250 to $2,600 per window for custom-fabricated shades and roughly $300 to $1,500 per window installed for motorized product. Those are national category ranges, not a bid for a building in Westfield, and nobody should treat them as one. Quantity helps on a large floor plate, and fire-rated fabric, submittal work and phased after-hours access all push the other way. A property in Hamilton County with a hundred identical openings prices very differently from one with forty odd shapes. Westfield Window Treatments bids from a measured opening schedule, with the fire documentation and the control specification written into it.

By Product

How Commercial Window Treatments Differ by Product

Every product in this trade behaves differently in a room. Here is what that means for this work.

NFPA 701 tested screen fabric: Solar screen woven and tested to the NFPA 701 flame propagation standard, with the test documentation available for the submittal. This is the starting point for any occupancy where the code official asks for it in writing.

Dual roller assembly: Two shades on one bracket set, typically a solar screen in front and a room darkening fabric behind. It lets a conference room work as a daylit space in the morning and a presentation room in the afternoon.

Continuous cord loop with tensioner: The manual control that handles weight best on large commercial units. The tensioner is fastened per the manufacturer instructions, and in child-occupied spaces we look at cordless or motorized instead.

Cordless lift: No accessible operating cord at all, which is what you want in classrooms, childcare rooms and paediatric spaces. It limits practical size, so past a point the answer becomes a motor rather than a bigger spring.

Low-voltage motorization: Hardwired motors with a wall keypad, which is the durable answer in a building where nobody wants to change batteries on a schedule. The power work is done by a licensed electrical contractor as part of the trade coordination.

Battery motorization for retrofit: Where opening a finished wall isn't on the table, battery or rechargeable motors get automation into an existing space. Budget for the replacement interval, because a floor of battery shades is a recurring facilities task.

ADA-height wall keypad: A fixed control placed inside the reach ranges in ADA section 308 and operable well under the five pound force limit in 309.4. It's often the cleanest way to satisfy accessibility on an opening a chain never could.

Light-blocking pocket and side channels: A pocket at the header plus channels at the jambs, so a training room or a sleep room goes properly dark instead of dim. It's the difference between a blackout fabric and a blackout result.

Wipeable vinyl-faced fabric: A non-porous face that takes repeated cleaning without breaking down, specified in clinical areas and food service where the surface has to be wiped down as a matter of routine.

PVC vertical blinds: Still the right answer for multifamily turns and back-of-house openings. Individual vanes replace cheaply when one gets damaged, which matters far more than aesthetics when a unit turns every year.

Common Questions

Commercial Window Treatments FAQ

Questions we hear most often from Westfield homeowners considering commercial window treatments.

By submittal rather than by the window. A commercial quote prices a schedule of openings against a specification, and the drivers are product line, fabric, control type, mounting substrate and how the installation has to be phased. Volume helps on unit cost and phasing usually costs more, since an install spread across evenings or between clinic sessions takes more days than a continuous one. What's genuinely different from residential is that the specification comes first, so two quotes against the same spec are comparable in a way residential quotes rarely are. Allowances for attic stock are also worth pricing at the outset, since a building that keeps a few spare units on hand fixes damage in days rather than months.
Two things that decide the specification. Section 308 sets reach ranges: forward reach 15 inches minimum to 48 inches maximum unobstructed, 44 inches maximum over an obstruction deeper than 20 inches; side reach 15 to 48 inches unobstructed and 46 inches maximum over an obstruction no deeper than 10 inches and no higher than 34 inches. Section 309.4 requires operable parts to work with one hand, without tight grasping, pinching or twisting the wrist, at no more than 5 pounds of force. Together those frequently rule out a manual chain at height and point to motorized control at a keypad. Where a space is being fitted for a specific tenant use, we'd raise control type at the design stage rather than pricing it after the layout is fixed.
It depends on the occupancy, and it's a question to settle before selecting anything. NFPA 701, 2023 edition, is the flame propagation test that commercial drapery and fabric specifications cite. Indiana enforces the 2014 Indiana Fire Code and Building Code, based on the 2012 IFC and IBC, and Chapter 8 of those covers draperies and decorative materials in regulated occupancies. Where it applies, the test documentation goes into the submittal with the product data. California Title 19 sometimes appears on a national manufacturer's data sheet and has no force in Indiana, so don't accept it as a substitute. Where documentation can't be produced for a fabric somebody has already selected, the honest move is to change the fabric rather than to hope nobody asks at inspection.
Yes, and it gets agreed at the schedule stage rather than negotiated on the first day. Hotels typically install floor by floor around occupancy. Medical suites go room by room between clinic sessions. Offices are usually evenings or a weekend. Each of those changes the day count and therefore the labor line, so it belongs in the quote from the start. What we won't do is quote a continuous install and then discover the building can't accommodate one, which is how a schedule slips and a tenant loses confidence. Access is the other scheduling item, since a lift in an occupied lobby is a different conversation from a ladder in a private office after hours.
By documenting the first phase properly. The as installed schedule records product line, fabric, color, finish code, control type and mounting detail for every opening, so a phase eighteen months later is specified rather than guessed. Even then, we're honest that dye lot and hardware finish drift between production runs, so a later phase can differ slightly from the original even with an exact specification. Where an exact match matters across a visible glass line, ordering the fabric for future phases up front is the only real solution. Keeping the as installed schedule with the building's own records rather than only with us is the practical safeguard, because contractors change and buildings outlast contracts.
Solar fabric with the openness chosen against the actual exposure, and in commercial space the choice runs a little lower in openness than a homeowner would pick, because a screen at the end of a table is less forgiving than a television in a family room. Where the glass line is large and faces west across open ground, which describes plenty of the newer Westfield office and hospitality space, dual band arrangements with a solar shade and a room darkening shade on the same opening let one room do both a daylight meeting and a presentation. Control height on a large glass line also has to work for the person who actually adjusts it daily, which is often a staff member rather than the occupant.
Regularly, and the working relationship is straightforward: they issue the specification and we price and deliver against it, flagging anything in the spec that won't perform as drawn rather than building it wrong and staying quiet. Common flags are a control height that won't meet reach requirements, an inside mount specified where the substrate won't take it, and a fabric selected without the flame propagation documentation the occupancy needs. Raising those at bid stage is far cheaper for everyone than raising them at handover. We'd also rather see the mounting substrate on a walk through than take it from a drawing, because existing buildings rarely match the documentation exactly.
Longer than residential and it depends on the submittal cycle as much as on fabrication. Custom product itself typically runs two to five weeks from an approved order, but a commercial job has an approval stage in front of that: submittal preparation, review by the architect or owner, and any resubmittal. That review period is outside our control and it's usually the biggest single variable. We give a fabrication lead time in writing once the submittal is approved, and we say plainly that planning an opening date around an unapproved submittal is a risk. Building the review time into the program from the start, rather than treating it as a contingency, is what keeps a fit out date from slipping late in the job.
It depends on the occupancy and on what your code official requires, which is why we ask before we specify. NFPA 701 covers flame propagation testing for textiles hung vertically, and assembly, healthcare, education and hospitality spaces are where it most often comes up. The part that trips projects isn't the fabric, it's the paperwork. Test documentation has to be in the submittal package, and a fabric someone believes is compliant without a document behind it will get rejected at review.
Two sections do most of the work. Section 308 sets the reach ranges for operable parts, which decides how high a chain, wand or keypad can sit and how far it can be from where somebody can get to. Section 309.4 caps the force to operate at five pounds and requires one-hand operation without tight grasping or twisting. A heavy chain on a large shade can fail that force test. When it does, the answer is usually a motor and a keypad rather than an argument.
That's the normal way we do it. Work gets phased by floor, wing or suite, with a schedule agreed in advance so nobody's meeting is happening under a ladder. Some scopes are better after hours and some are fine mid-morning in an empty conference room. We sort out badge access, elevator use and where the boxes stage before the first crew day, because the thing that actually derails a commercial install is access, not product.
Offices, healthcare, education, hospitality and multifamily, and each one changes the specification. Healthcare wants wipeable surfaces and infection control input. Education wants cordless lifts and hardware that survives teenagers. Hospitality wants blackout that genuinely works, because a guest who can't sleep leaves a review about it. Multifamily wants a product that's cheap to repair one vane at a time. Offices want glare control on the monitors. The building type usually tells us the fabric before the design conversation starts.
Custom fabrication generally runs two to five weeks, and a large commercial order with submittal review and approval on top of that runs longer. The sequence matters: samples out, approvals back, then release to fabrication, and the clock on the factory doesn't start until approval lands. We put every date in writing and we update it in writing when the factory changes it. Building a schedule around a verbal lead time is how a project ends up with bare openings at occupancy.
Three percent is the common answer on the elevations that get direct sun, with five percent where the exposure is gentler and view matters more. The test isn't how the fabric looks in a sample book, it's whether somebody can read a monitor at the worst hour of the day. We'll hang a sample on the actual elevation and let people sit under it. Getting this wrong across a floor of a Westfield building is expensive, and it's entirely avoidable.
Yes, and we treat both as part of the scope rather than a favor. Submittals include fabric and hardware samples, cut sheets, the fire test documentation where the occupancy requires it, and a shade schedule tied to the opening numbers. At closeout, facilities gets operation and cleaning information, the fabric and hardware identification for reorders, and the attic stock count. That last one saves a lot of trouble two years later when somebody needs one shade replaced and nobody remembers the fabric.
Motorize where a manual control fails on reach, force or height, where the openings are high or behind furniture, and where the shades should move on a schedule rather than on somebody remembering. Leave manual where the openings are ordinary and reachable, because motors add cost and a maintenance obligation. The mistake we see most is motorizing a whole floor to solve a problem that exists on one elevation. Specify per opening, not per building.
They're the right answer in a retrofit where nobody's opening a finished wall, and they come with an obligation you should accept before you buy. Hunter Douglas states PowerView battery life is about one year, and commercial use with daily scheduled cycles doesn't improve on that. Multiply by the opening count and you have a recurring facilities task. Where power can be brought to the header, hardwired low-voltage motors are the better long-term call, with a licensed electrical contractor doing that part.
They get treated as one line, not as separate shades that happen to be near each other. Tubes are coupled where the spans call for it so the shades track together, and hembars are aligned so a partly lowered run doesn't look ragged from the street. On a motorized job the group is addressed to one control so nobody has to press five buttons. This is the detail that separates a commercial install that looks intentional from one that looks assembled.
A blackout fabric alone gets you dim, not dark, because light comes around the edges of any inside mount. For a room where a projected image has to hold contrast, we specify blackout fabric with a light-blocking pocket at the header and side channels at the jambs. If the room also gets used for daylit work, we run a dual roller so the screen fabric handles the everyday condition and the blackout comes down only when it's needed.
Often, and it's worth a conversation before you assume it. Bring us a shade or the original paperwork and we'll identify the fabric and hardware if it's still made. Two honest cautions: fabrics get discontinued, and fabric still in production runs in dye lots, so a new run can sit slightly off older shades on the same floor. Where the match won't hold, replacing a whole elevation at once usually looks better than patching one opening.
We are, and we insist on field measuring rather than working from the drawings. As-built openings differ from the plan more often than not, and a shade schedule built from a drawing produces a stack of product that doesn't fit and can't be returned. That means we need the openings framed and reasonably finished before we measure, which affects the schedule. We'd rather have that conversation with the general contractor early than explain a reorder later.
This is why attic stock is agreed at the start. A few spare units in the common sizes mean facilities swaps the damaged one the same week instead of waiting on a fabrication run for a single shade. Where a spare isn't available, we reorder from the shade schedule using the opening number, the fabric and the finished sizes we recorded. That record is the reason we hand over documentation rather than assuming somebody kept the packing list.
Areas We Serve

Commercial Window Treatments Across Westfield

We measure and install in every one of these Westfield neighborhoods. Each has its own page with the build eras, window conditions and mounting notes for that section.

Free In-Home Measure

Schedule Your Free In-Home Measure in Westfield

Contact Information

Reach Us Directly

Our team prioritizes scheduled measures and service calls, and books in-home measures during business hours.

Office
1417 Commerce Avenue, Indianapolis, IN 46201
Hours
Mon-Fri 8a-6p
Service Area
Westfield, IN and Surrounding Areas

Ready to Book Your Measure?

Call us to set up an in-home measure, or to ask about a treatment that has stopped working. We will talk it through on the phone first.

Service area

Serving Westfield and the surrounding area

Call NowGet Quote